Gidea Park Romford

Location:Gidea Park Compound, Romford

Commisioned by: Collis Engineering

Date: Week 30 - October 2017

Plant: 1 x 40t city rail crane, 1 x PW 160, 3 x chieftain rail trailers, 2 x Z62/40 Rail Mewp, 1 x Demag AC 100-L.

Points of Interest: Install 2 x 9.3t booms and cages on the Gidea Park re signalling project over three shifts. The 100t Demag was used to load out the equipment and the PW 160 delivered the equipment to site.
The 40t crane was used for the installation of the equipment and the Z62/40 MEWPS were used to secure the equipment into place. The work was done over two locations.