Points of Interest:
These works provided a safe alternative for the local community including school children, to safely cross the rail tracks, previously they would have used the level crossing.  By utilising a rail crane, the end client was able to complete the works with minimal road closures and disruptions to the community.
The bridge opening was attended by Cllr Alexander Emann (Cabinet Minister for Transport, Streetscene and Air Quality), David Smith (NR HSEQ Director), local school children and various others responsible for supporting the works.

Plant used:
RRC provided an AC55 Road Rail Crane over 2 shifts to install the main support trestles, stairs and bridge span under our own POS License. 
 